Fire safety in-house.
F113 final reports, building class 4–5, special-use buildings — with our own certified specialists. Alarm systems and emergency lighting are installed by us as well. No eight-week wait for an external fire-safety planner.
From fire-safety design and building permit through structural engineering and change-of-use to turnkey handover – including heritage protection. We take care of everything, from first site visit to final approval.
Or call us directly: 030 319 98 071
Give us your project — we handle the entire path. Authorities, fire safety, structure, building permit, change-of-use, heritage protection and turnkey construction.
F113 final reports, building class 4–5, special-use buildings — with our own certified specialists. Alarm systems and emergency lighting are installed by us as well. No eight-week wait for an external fire-safety planner.
Simplified procedure under §63 BauO Bln, change-of-use, heritage coordination with the UDB — we talk to the building authority directly, not through middlemen.
Site visit, existing-condition assessment, line-item tender before contract. Extras only on documented findings — no creeping costs after construction starts.
SEALDEX delivers complete renovations, fit-outs and fire-safety upgrades — with an in-house team and trusted partners for structure, building services and fire-safety engineering.
We guide your project through the Berlin building authorities – including change-of-use applications, submission documents and agency communication.
More →Fire-safety concepts and reports with certified specialists, F112/F113 documentation up to building class 5 – and we install what the report requires: building alarm systems, emergency lighting, penetration seals, fire doors.
More →Structural strengthening, roof extensions, ring beams, wall plates – with our structural engineers and inspectors.
More →Construction within listed heritage stock, coordinated with the Lower Heritage Authority.
More →From shell to handover. All trades, one point of contact, one schedule and one budget.
More →Drywall, plaster, paint, tile, flooring – cleanly aligned with plumbing and electrical.
More →Medical practices, offices, hotels, sauna venues – with hygiene, acoustic and ventilation concepts.
More →Complete tile installations across Berlin's new-build districts – High Park, A SPACE, The Yard, Mauerpark MP3.2 and many more.
More →Fire-safety final reports, partial occupancy approvals, heritage-compatible renovation — a selection of current and completed projects.
Gaudystr. 10, 10437 Berlin
Milinowskistraße 11, 14169 Berlin
Gigafactory Berlin-Brandenburg, 15537 Grünheide (Mark)
Am Treptower Park 44, 12435 Berlin
Am Treptower Park 39, 12435 Berlin
Konstanzer Str. 6, 10707 Berlin
Selections from current projects. Stucco preserved, parquet restored, bathrooms and kitchens rebuilt — with full responsibility for fire safety and structure.
Owner-led by Z. Fridman. A permanent team in Berlin, bilingual (DE/RU), working closely with structural and fire-safety engineers and building-services planners.
We take projects end-to-end — from site survey through permit and approval to final acceptance and handover.
More about usInitial conversation, site visit and fixed-price quote. We get back to you within one working day.
Request a quote